TITLE: LAND FLOW STATION UPGRADE, 10 FLOW STATIONS (ADDAX-PO –4024-36237) – DIRECT MAJOR CONTRACTS –ON GOING

JOB SPECIFICATION:

  • Upgrading of flow station instrument system
  • Installation of fire loop system
  • Incorporation of ESD systems in the flow station
  • Installation of flow station utility lines
  • Installation of blow down system for flow station
  • Procurement of instruments and construction
TITLE: ALAKIRI GAS PLANT DEBOTTLENECKING CONSTRUCTION (SPDC EAST E –03611) –SUB-CONTRACTS JOB SPECIFICATION:
  • Revamping of the process vessel internals
  • Complete plant Instrumentation works
  • Replacement of interconnecting process piping
  • Procurement of instrument materials & fittings
  • Installation of new LV panels, breakers/Commissioning
  • Commissioning of 2Nos Instrument air compressors
  • Rehabilitation & commissioning of glycol regeneration units
  • Rehabilitation & commissioning of Hot water bath units
  • Rehabilitation & commissioning of the plant flare system including installation of John Zinc Flare ignition panel
  • Rehabilitation & commissioning of the plant control room panel instruments
  • Commissioning of 2Nos, 300kva CAT generator sets
  • Commissioning of the Alakiri gas.
TITLE: UTOROGU & UGHELI-EAST GAS PLANT REFURBISHMENT & MAINTENANCE (SPDC WEST W –01928) -–SUB- CONTRACTS

JOB SPECIFICATION:

  • Revamping of the process vessel internals
  • Complete plant Instrumentation works & Revamping of the plant UPS system
  • Replacement of interconnecting process piping
  • Procurement of instrument materials & fittings
  • Installation of new LV panels, breakers/Commissioning
  • Commissioning of 2Nos Instrument air compressors
  • Rehabilitation & commissioning of glycol regeneration units, Hot water bath units
  • Rehabilitation & commissioning of the plant control room panel instruments
  • Procurement, Installation & Commissioning of 2Nos, 675kva CAT generator sets
  • Commissioning of the Utorogu/Ughelli–East gas.
TITLE: OBIGBO NODE –AGG PROJECT, IMO RIVER GAS PLANT AND FLOW STATION (KELLOGG MAIN CONTRACTOR TO SPDC EAST6585 –99PX/X) –SUB-CONTRACTS

JOB SPECIFICATION:

  • Transportation and erection of all AGG compressors at Imo River
  • Erection of 150ft high flare stack
  • Prefabrication of all inter connecting pipe to equipment
  • Provision and installation of pipe supports for the AGG plant
  • Prefabrication of AGG plant stainless steel pipe tie –in and installations
  • Erection of all steel structural structures within and outside the plant
  • Lay and weld various sizes of line pipes from adjoining flow stations to the AGG plant for gas supplies
  • Erection fence round the AGG plant
  • Installation of cathodic protection for the pipelines
  • Calibration of all plant Instruments
  • Installation of pipeline anchors
  • Testing and pre commissioning of Imo River AGG plant
  • Electrical lighting, Lighting protection, power installations
TITLE:  PHASE 1 NLNG GAS SUPPLY PROJECT AT OB/OB -NAOC (AGIP)N8Y0640P/01 – –SUB-CONTRACT

JOB SPECIFICATION:

  • Procurement of fittings and valves
  • Procurement of Electrical and Instrument materials
  • Civil foundation works for phase –1 NLNG gas supply facilities
  • Fabrication and installation of piping works for NLNG gas supply facilities at OB/OB gas plant
  • Installation of plant electrical system
  • Complete instrumentation for NLNG gas supply facility
  • Revamping of Heater 410 –FH –2
  • Installation of 2 Probar Volumetric flow meters
  • Installation of Oshie gas temporary Slug Catcher
  • Construction of Slug Catcher concrete foundation
  • Fabrication and installation of supports
  • Hot tapping of 10”live line to provide a 4”take off line on MPG –004 –10 –BO1 link with MP liquid receiver
TITLE: TWISTER TRIAL TECHNOLOGY AT UTOROGU GAS PLANT (SPDC WEST W –09674) –SUB-CONTRACT JOB SPECIFICATION:
  • Twister installation detailed design
  • Preparation of foundation for Twister installation
  • Transportation of Twister package from port to site
  • Assembling and installation of Twister gas processing plant at Utorogu gas plant
  • Complete Instrumentation (DCS) works for Twister plant
  • Provision of power supply to Twister plant from Utorogu gas plant power system
  • Pre commissioning and commissioning of Twister plant
TITLE:  JONESCREEK FACILITIES UPGRADE (SPDC WEST W –01939) –SUB- CONTRACT

JOB SPECIFICATION:

  • Piping upgrade at process headers up to vessel inlet
  • Pilling & Preparation of vessel foundations for 120m³capacity diesel storage tanks
  • Pilling & Preparation of foundation for utility building
  • housing 2Nos 1200KVA generators, 3Nos 350cmf Instrument air compressors, 1No 950KVA diesel generator including erection of the building
  • Pilling & Preparation of Crude pumps foundations (10 Bays) including installation and
  • Installation of LV switch board and synchronizing panel
  • Installation of complete flow station lighting system
  • Installation of earthing and lighting system
  • Prepare foundation and complete erection of a new control room for the DCS and a laboratory
  • Pilling and construction of a new saver pit for the Jones creek flow station
  • Pilling and construction of a new chemical shed
  • Commissioning of Jones creek flow station and the provision of piping close drain system in flow stations
TITLE: BRASS TERMINAL & CLOUGH CREEK FIRE FIGHTING REVAMPING (NAOC –AGIP 951794/4) – –SUB-CONTRACT

JOB SPECIFICATION:

  • Detailed Engineering of
  • Equipment procurement (Piping, valves & Bulk Materials).
  • Repair of water tank (T –401) foundation including bottom plate and first course of tank shell complete with piping connections
  • Installation of fire detection system extinguishing system, Local panels, Foam sprinklers and auto manual control valve and smoke detector in Instrument control
  • Installation of Installation of NAF SIII system for Electrical substations and protection of
  • Installation of heat detectors & gas detectors for battery
  • Replacement of 16”Ø underground pipe along the canal to jetty
  • Replacement of 24”Ø above ground at the TK 18
  • Commissioning of Brass terminal fire fighting system
TITLE: NLNG BACK-UP GAS SUPPLY PROJECT (SPDC EAST E-12635) –SUB-CONTRACT

JOB SPECIFICATION:

  • Gas dehydration Plant
  • 12km of 13% cr –14”Gas Supply Pipeline
  • 2km of CS –16”Delivery Line to NLNG
  • 4 No. x 10km CR13 10”Pipeline
  • Fiber Optical Cable Installation
  • Partial Supply
  • Erection
  • Commissioning
TITLE: NIGERIA 450 MWE POWER PLANT LAND PIPELINE AND INTERCONNECTING WORKS (NAOC) –SUB- CONTRACT

JOB SPECIFICATION:

  • The Scope consist s of the execution of:
  • 18”Fuel Gas Pipeline
  • 4”Closed Drain Pipeline
  • 4”Process Water Pipeline
  • Fiber Optic Cable
  • 1 16”Water Pipeline
  • Interconnecting Works including all
  • necessary process facilities and auxiliaries
  • Cathodic protection
  • Between NAOC-KGP Gas Condensate Treatment Plant (KPG) and new Nigeria 450Mw Power Plant
TITLE: Forcados-Yokri Integrated Project Contract W-06381 Onshore EPIC Works CPC/CCP and North Bank Flowstation
  • SUB-CONTRACT JOB SPECIFICATION: STRUCTURAL/CIVIL WORKS
    • Cut off already installed piles and cap them
    • Construction equipment foundations as per civil drawings
    • Construction of plant road way with concrete paving lock tiles
    • Construction of pipe supports and concrete slabs
    • Construction of concrete drains within the plant area
    • Construction of process area floor slab
    • Fabrication and installation of structural members and supports
    • Construction of equipment shelter such as crude oil pumps ERECTION OF PROCESS EQUIPMENT
    • Erection of process skids on foundations such as compressor and turbines, etc
    • Erection stand alone process equipment on foundations
    • Erection of flare and knock out drum
    • Erection of all utilities such as service water tanks, etc

FABRICATION & INSTALLATION OF PROCESS INTERCONNECTING PIPINGS

  • Fabrication and installation of process interconnecting piping as per drawings
  • Tie in piping works as required in the process and utilities drawings
  • Hydro -testing of new pipe works as per specifications and class
  • Welding procedure qualifications
  • Fabrication and installation of utilities interconnecting piping as per drawings